A cloakroom in the old town area of Swindon. The work consists of full design and build to include: Removal of the existing suite and tiles. Removal of the existing rotten floor and replace with plywood. Alterations and replacement of all plumbing and waste. Plaster skimming and setting out for new suite. Installation of basin, W.C., Taps, valves & pipe work. Full tiling and grouting.. Second fix all brassware and silicon seals to complete. |
Home > Swindon Plumbing News >